Several things are happening at the house at the moment. The house is being prepared for all the plumbing and electricity lines to be placed, which means that holes are being drilled everywhere, including the space we are using to live in at the moment. On the ground floor, all the inner walls for the ensuite bathrooms are being placed. And outside all the old paint is being removed from the walls with high pressure water. Pictures have been added in the slideshow to the right to show you a little bit of what is happening.
Joepie de poepie! Wij zijn followers geworden! Leuk om de foto's hier te kunnen bekijken en zo de werken mee in het oog te houden. Wel goed dat er commentaar bijstaat, want anders is het niet zo duidelijk. Ik dacht al dat jullie aan het verven waren! Let maar op met die giftige beestjes! En succes met de moestuin!